Tošanovice-Žukov Bridge, Czech Republic

Données des projets

Localisation: Ostrava, République tchèque

Design: steel composite bridge
Length: 720 m

Exigences

The strut axes open out from 6.50 m to 9.00 m in the centre of the bridge.

Client

Metrostav a.s., Division 4, Prague

Avantages pour le client

  • flexible connecting possibilities for steel walers, scaffold tubes, heavy-duty spindles and tie rods
  • can be adapted to various main beam spacings
Martin Šimek, Site Manager
Martin Šimek
Site Manager

The erection of steel composite bridges is considerably easier and much faster with the PERI formwork carriage construction.

Solution PERI

Two modular formwork carriages from the VARIOKIT system